Save Passamaquoddy Bay

Save Passamaquoddy Bay
3-Nation Alliance

Alliance to Protect the Quoddy Region
from LNG Development

US Flag
US
Canadian Flag
Canada
Passamaquoddy Flag
Passamaquoddy
Scale Baskets for sale
Loading
Facebook button

"For much of the state of Maine, the environment is the economy"
                                           — US Senator Susan Collins, 2012 Jun 21



 

FERC eLibrary
Downeast LNG Export Proposal
Pre-filing Comments List

2014 September

Docket Number PF14-19

Listed here in Ascending Date Order by Date Posted to FERC eLibrary.
NOTE: The Docket List on the FERC website is in Date Order by Date Filed, rather than by Date Posted.

Color Key: Project Developer, Contractors & Supporters
Project Opponents
Project Neutral
Unknown, non-public comments

Pre-filing
2014 September

Listed here in Ascending Date Order by Posted Date, rather than by Filed Date to FERC eLibrary.
NOTE: The Docket List on the FERC website is in Date Order by Date Filed, rather than by Date Posted.

Sep 11

Filed By: Downeast Liquefaction, LLC Downeast LNG, Inc. Downeast Pipeline, LLC
Filed Date: 9/11/2014
Accession No: 20140911-5033
Description: Downeast Liquefaction, LLC, et. al. submits a Draft Resource Report 1 for the Downeast LNG Export Project under PF14-19.
Information: FILE LIST [Non-public; downloading will result in an error file.]

Top


Filed By: Downeast Liquefaction, LLC Downeast LNG, Inc. Downeast Pipeline, LLC
Filed Date: 9/11/2014
Accession No: 20140911-5034
Description: Downeast Liquefaction, LLC, et. al. submits a Draft Resource Report 1 for the Downeast LNG Export Project under PF14-19.
Information: FILE LIST

Summary: Draft Resource Report 1 includes a general project description, the list of impacted landowners (Privileged and Confidential; therefore, Non-Public), and a summary of alternative sites that were considered by the applicant.

Top


Filed By: Downeast LNG, Inc. Downeast Liquefaction, LLC Downeast Pipeline, LLC
Filed Date: 9/11/2014
Accession No: 20140911-5187
Description: Downeast Liquefaction, LLC, et. al. submits its Monthly Pre-Filing Status Report No. 1 for the period of August 11, 2014 to September 10, 2014, under PF14-19.
Information: FILE LIST

Summary: Monthly Filing Status Report 1, for 2014 Aug 11–Sep 10.

Top


Sep 22

Issued By: ENERGY PROJECTS, OFFICE OF [FERC]
Filed Date: 9/16/2014
Accession No: 20140916-4016
Description: Interagency Meeting Notes, dated 9/16/14 of the Downeast LNG Import-Export Project under PF14-19.
Information: FILE LIST

Summary: This interagency meeting was held at the Maine Department of Environmental Protection office in Bangor, Maine. The purpose was to inform various federal and state agencies of Downeast LNG's Export Project (PF14-19).

State agencies present were:

  • Maine Department of Environmental Protection (DEP);
  • Maine Department of Inland Fisheries and Wildlife (DIFW); and
  • Maine Department of Marine Resources (DMR)

Federal agencies present were:

  • Federal Energy Regulatory Commission (FERC) — including Shannon Crosley, FERC's Downeast LNG project manager who did not appear (claiming "sickness") at the Downeast Open House in Robbinston later that same day. (We are betting that Ms. Crosley's "sickness" was her method of avoiding facing a public well aware of her production of the previous unprofessional, flawed, incomplete, and unethical FERC Downeast LNG Final Environmental Impact Statement);
  • Tetra Tech (FERC's contractor re Downeast LNG);
  • US Army Corps of Engineers (COE);
  • US Fish and Wildlife Service (USFWS);
  • US Coast Guard (USCG);
  • US Environmental Protection Agency (EPA);
  • US Department of Transportation (USDOT); and
  • National Oceanic and Atmospheric Administration National Marine Fisheries Service (NOAA Fisheries

And, naturally, Downeast LNG was present (Dean Girdis and Rob Wyatt).

[Although this document's filed date indicates 2014 Sep 16, the filing did not appear on the docket until 2014 Sep 22.]

Top


Sep 23

Filed By: Save Passamaquoddy Bay
Filed Date: 9/23/2014
Accession No: 20140923-5035
Description: Open House information regasification volume inaccuracy, comment of Save Passamaquoddy Bay under PF14-19.
Information: FILE LIST

Summary: Save Passamaquoddy Bay reveals Downeast LNG and FERC misinformation in both Downeast LNG's Resource Report 1 filing to the FERC docket and in FERC's Downeast LNG Open House handout.

Top


Sep 24

Filed By: Save Passamaquoddy Bay
Filed Date: 9/24/2014
Accession No: 20140924-5072
Description: Motion of Save Passamaquoddy Bay to Dismiss Downeast LNG Import Proposal under CP07-52, et. al..
Information: FILE LIST

Summary: Due to Downeast LNG Export proposal pre-filing Resource Report 1, as well as FERC's public handout at the Downeast LNG Open House in Robbinston on 2014 September 16, stating that Downeast LNG now intends to produce an absurdly-small 100 cubic feet per day of regasified natural gas from LNG — equivalent to the methane volume produced daily by 6–12 cows — Save Passamaquoddy Bay petitions FERC to summarily dismiss Downeast LNG's Import proposal from permitting.

Top


Add our banner to your webpage: Save Passamaquoddy Bay

Read about the effort to Fix FERC: FixFERC



@MEMBER OF PROJECT HONEY POT
Spam Harvester Protection Network
provided by Unspam