FERC eLibrary
Downeast LNG Export Proposal
Pre-filing Comments List

2015 August

Docket Number PF14-19

Listed here in Ascending Date Order by Date Posted to FERC eLibrary.
NOTE: The Docket List on the FERC website is in Date Order by Date Filed, rather than by Date Posted.

Color Key: Project Developer, Contractors & Supporters
Project Opponents
Project Neutral
Unknown, non-public comments

Pre-filing
2015 August

Listed here in Ascending Date Order by Posted Date, rather than by Filed Date to FERC eLibrary.
NOTE: The Docket List on the FERC website is in Date Order by Date Filed, rather than by Date Posted.

Aug 3

Filed By: Downeast LNG, Inc.
Filed Date: 8/3/2015
Accession No: 20150803-5254
Description: Draft Resource Report 1, DELNG Export Project of Downeast LNG, Inc. under PF14-19
Information: FILE LIST

Summary: Export project general description.

Top


Aug 10

Issued By: ENERGY PROJECTS, OFFICE OF [FERC]
Filed Date: 8/10/2015
Accession No: 20150810-4002
Description: Bi-Weekly Conference Call Notes dated 8/3/15 between FERC & U.S. Army Corps of Engineering re the Downeast LNG Export Project under PF14-19.
Information: FILE LIST

Summary: Downeast LNG revised draft Resource Report 1 (Project Description) and filed it to the FERC docket on Aug 3. Draft Resource Report 5 (Socioeconomics) is planned to be filed next. FERC intends to issue a project update mailer soon.

Top


Aug 11

Filed By: Downeast LNG, Inc.
Filed Date: 8/11/2015
Accession No: 20150811-5083
Description: Downeast LNG, Inc. Monthly Status Report #12. under PF14-19.
Information: FILE LIST

Summary: Downeast LNG anticipates no changes to location of major equipment illustrated on the plot plan. No pipeline survey work was performed. No environmental surveys or analyses were performed. No project alternatives evaluations were performed. No stakeholder notices were issued.