FERC eLibrary
Downeast LNG Formal Application
Comment Filings List

Docket Number CP07-52

2013 April

Color Key: Project Developer, Contractors & Supporters
Project Opponents
Project Neutral
Unknown, non-public comments

2013 April

Listed here in Ascending Date Order by Posted Date, rather than by Filed Date to FERC eLibrary.
NOTE: The Docket List on the FERC website is in Date Order by Date Filed, rather than by Date Posted.

Apr 8

Filed By: Downeast LNG, Inc. DOWNEAST LNG LP
Filed Date: 4/8/2013
Accession No: 20130408-5075
Description: Comments of Downeast LNG, Inc., et. al. under CP07-52, et. al..
Information: FILE LIST

Summary: Downeast LNG claims that FERC's conclusion regarding vapor dispersion from an break along the LNG ship-to-shore transfer line is inaccurate. (FERC has indicated it would violate the vapor dispersion Exclusion Zone regulation.) Downeast LNG states that it will conduct dispersion modeling for two additional such scenarios.

Downeast LNG is attempting to wrest its way out of a project-killing regulation violation.

Top


Apr 10

Filed By: Roosevelt Campobello International Park Commission
Filed Date: 4/10/2013
Accession No: 20130410-5098
Description: Roosevelt Campobello International Park Commission comments on the Downeast LNG Project Supplemental Draft Environmental Assessment, Docket Nos. CP07-52, et al.
Information: FILE LIST

Summary: The Park Commission remains opposed to Downeast LNG, and recommends that FERC deny Downeast LNG's permits. The Park Commission believes that Downeast LNG previously had ample time to submit its vapor dispersion modeling, and should not be given additional time to change the results.

Top


Filed By: Roosevelt Campobello International Park Commission
Filed Date: 4/10/2013
Accession No: 20130410-5100
Description: Roosevelt Campobello International Park Commission offers a revision to the Service for the Downeast LNG Project, Docket Nos. CP07-52, et al.
Information: FILE LIST

Summary: This is a notice of a Service List change. (NOTE: FERC typically does not change the official Service List based on a docket filing. —SPB webmaster)

Top


Apr 16

Filed By: INDIVIDUAL [Romma Pesha]
Filed Date: 4/16/2013
Accession No: 201300416-0008
Description: Comments of Romma M Pesha re the Environmental Impact Statement under CP07-52.
Information: FILE LIST

Summary: Mrs. Pesha advocates that FERC deny Downeast LNG's permits, due to impacts on vulnerable land, water, wildlife, and wetlands.

Top


Apr 17

Filed By: US DEPARTMENT OF HOMELAND SECURITY [Coast Guard]
Filed Date: 4/15/2013
Accession No: 201300416-0029
Description: Correspondence from US Department of Homeland security to Downeast LNG, Inc re the Downeast LNG Waterway Suitability Assessment under CP07-52.
Information: FILE LIST

Summary: The US Coast Guard responds to Downeast LNG's annual, internal review of the Waterway Suitability Assessment (WSA), indicating that updates reported by the applicant "are clerical in nature and do not change the overall port environment, nor do they affect the suitability of the waterway for marine LNG traffic."

The Coast Guard also indicates that the next review of the WSA is due on 2014 Jan 6, and on Jan 6 each year into the future.

Top


Apr 22

Issued By: [FERC] ENERGY PROJECTS, OFFICE OF
Filed Date: 4/22/2013
Accession No: 20130422-3026
Description: Letter to Downeast LNG providing a response to comments on supplemental DEIS Modeling Assumptions for the Downeast LNG Project udner CP07-52 et al.
Information: FILE LIST

Summary: FERC indicates it agrees with Downeast LNG's proposal to perform additional vapor dispersion modeling, using the two proposed LNG release locations, including shoreline topography and a three-dimensional model of the facility, and a 1/3-pipeline-diameter hole in the LNG unloading line.