Save Passamaquoddy Bay

Save Passamaquoddy Bay
3-Nation Alliance

Alliance to Protect the Quoddy Region
from LNG Development

US Flag
US
Canadian Flag
Canada
Passamaquoddy Flag
Passamaquoddy
Scale Baskets for sale
Loading
Facebook button

"For much of the state of Maine, the environment is the economy"
                                           — US Senator Susan Collins, 2012 Jun 21



 

FERC eLibrary
Downeast LNG Formal Application
Comment Filings List

Docket Number CP07-52

2014 March

Color Key: Project Developer, Contractors & Supporters
Project Opponents
Project Neutral
Unknown, non-public comments

2014 March

Listed here in Ascending Date Order by Posted Date, rather than by Filed Date to FERC eLibrary.
NOTE: The Docket List on the FERC website is in Date Order by Date Filed, rather than by Date Posted.

Mar 5

Filed By: US COAST GUARD
Filed Date: 3/5/2014
Accession No: 20140305-4002
Description: Coast Guard response letter re the Downeast Liquefied Natural Gas Waterway Suitability Assessment under CP07-52 et al.
Information: FILE LIST

Summary: The Coast Guard confirms Downeast LNG's latest annual Waterway Suitability Report conclusions that the waterway has not changed in suitability for LNG traffic, and that the next report is due on 2015 Jan 6. (Save Passamaquoddy Bay takes issue with the Coast Guard's conclusion. Although the waterway has not changed significantly in the past year, LNG traffic has not suddenly become "innocent passage" in the Canadian waterway. In fact, Canada has defined LNG traffic into Passamaquoddy Bay as non-innocent, disqualifying Downeast LNG from permitting.)

Top


Mar 11

Filed By: Save Passamaquoddy Bay
Filed Date: 3/11/2014
Accession No: 20140311-5118
Description: Motion to Dismiss for Cause of Save Passamaquoddy Bay under CP07-52, et al.
Information: FILE LIST [Non-Public; downloading will result in an error]

Summary: This is the Non-Public version of Save Passamaquoddy Bay's Motion to Dismiss for Cause.

Top


Filed By: Save Passamaquoddy Bay
Filed Date: 3/11/2014
Accession No: 20140311-5119
Description: Motion to Dismiss for Cause of Save Passamaquoddy Bay under CP07-52, et al.
Information: FILE LIST

Summary: Save Passamaquoddy Bay petitions FERC to Dismiss Downeast LNG for Cause, listing a plethora of reasons.

Top


Mar 28

Filed By: Save Passamaquoddy Bay
Filed Date: 3/28/2014
Accession No: 20140328-5271
Description: Motion to set back FEIS release date and permitting decision due to FOIA issues, of Save Passamaquoddy Bay under CP07-52, et al.
Information: FILE LIST

Summary: Save Passamaquoddy Bay petitions FERC to delay release of the FEIS and final permitting decision due to Downeast LNG's improper and incomplete release of Freedom of Information Act (FOIA) requested data.

Top


Mar 31

Filed By: Save Passamaquoddy Bay
Filed Date: 3/31/2014
Accession No: 20140331-5430
Description: LNG storage tank explosion in state of Washington, comment of Save Passamaquoddy Bay under CP07-52., et al.
Information: FILE LIST

Summary: Save Passamaquoddy Bay reports on a 2014 March 31 LNG storage tank explosion in the state of Washington — an event that "cannot occur," according to ongoing assurances by FERC and the LNG industry.

Top